COMPLETION & PRODUCTION RENTAL EQUIPMENT
Flowback and well testing expertise: frac watch/ screen out packages, drill out packages, and production/ flow testing.
We use the best, most technologically advanced equipment on the market, and we pride ourselves on making sure it is consistently well-maintained and meets API standards.
- Sand Commander Units
- Flow iron/Valves (2” & 3”)
- Chokes/Manifolds (2” & 3”)
- Sand Separators (3K – 15K)
- Cyclonic Sand Separators (5.8K & 10K)
- Plug Catchers (Hydraulic & Double Barrel)
- Flow tanks (w/ and w/o gas busters)
- Test Separators (250 – 1,440 PSI)
- Half Pits, 80 BBL pits, 40 BBL pits
- Flow Crosses (7 1/16″ 5K & 10K)
- Flare Stacks
- Green Complete Tanks
- Pump Trucks (2,500 HP)
- Lay Flat Hose (8”, 10’, & 12”)
- 325 HP & 600 HP Water Transfer Pumps